VHF Channel 68

'Beaulieu River Radio'
01590 616200

On the 28th April, there will be no access to water on the pontoons due to the chlorination of the water pipes.
On the 29th April, there will be limited access to the facilities due to chlorination works. We apologise for any inconvenience.

Latest news

New on-site marine engineer for Buckler’s Hard boatyard

9th Aug 2019
Beaulieu River > River News > Facilities > New on-site marine engineer for Buckler’s Hard boatyard

We’re pleased to announce that Alex Cobb has joined the group of approved suppliers at the Buckler’s Hard boatyard.

Alex Cobb offers marine engineering service and repair on all inboard and outboard engines, as well as marine electronics, rigging, GRP repairs and valeting.

Alex will be on site at Buckler’s Hard Yacht Harbour six days per week; Monday to Friday (8am – 5pm) and Saturday (8am – 12.30pm).

The Buckler’s Hard boatyard approved suppliers are known for their high standard of service and are pre-registered to deliver services at Beaulieu River and the boatyard. For more information, or to contact Alex, please visit our approved suppliers page.

Previous post Next post

More news items

As Sue and Steve at The Boatyard Bar say, the difference between a good and a great summer season is dropping in at The Boatyard Bar for a drink and a chat.
Make the most of later sunsets and longer evenings on the water, as the clocks change.
As construction is completed on the external boatshed building, work has moved inside to create new waterfront offices and workshops for the 2025 sailing season.